
PDCA Sheet Why the PDCA sheet is prepared? What was the reason for PDCA sheet is prepared. Actual – Starting Date of Project, Do – Date of project, Check – Date of Project, Act – Date of Project, information…

Rejection Analysis Sheet Unit Name where production in – process inspection, analysis process are done. Production line name is very important in case of the in the single unit multiple production lines are works. Material Description – Description…

Production Schedule vs Actual Date – Date of the production Schedule start Name of workstation where production scheduled and being perform Shift – As per production schedule against actual production measurements can be shift wise, there also possible that…

Process Capacity sheet Date of process capacity measured Production / Process line name where process capacity sheet is going to raised. Material Identification number and name Material quantity – total quantity used for the process capacity measures and used…

Data analysis plan Process name is very important in the data analysis, base of the data analysis is depends and record information are process & its data collection. Data – for the data analysis, process’ data collection from manufacturing…

Defect check sheet Location – Name of location where manufacturing operation and defect checking process are done. Product – name of the product run on manufacturing process, defect checking is the separate process of the manufacturing process its individual…

Budget Amendment Form Budget amended by and Date – information of budget amendment preparation & on which date amended budget is declared Reason for amendment of budget, all the reason behind the changed had made by the company…

Electrical Project Cost In the manufacturing industry, electrical works are in general but very important for the each segment of the manufacturing units, All the machines & equipments are works by electricity hence the each electrical project has conduct…

Chemical Waste Inventory Sheet Name of Department that chemical waste generated during the manufacturing / non manufacturing / process supporting chemical waste, recording of the department name is very important that generating the chemical waste. Chemical Name – Name…
