
Design information Checklist Points : APQP
Design information Checklist Points : APQP A. General Does the design require: New materials? Special tooling? Has assembly build variation analysis been considered? Has Design of Experiments been considered? Is there a plan for prototypes in place? Has a DFMEA…

Preventive Action Request
Preventive Action Request Most of the industrial people are change or replace part after damage happen with machine or machine’s part, but the preventive actions are mostly not happens due to not awareness of the preventive action and ungrateful find…

Audit Training Evaluation Sheet
Audit Training Evaluation Sheet Audit Training is unscheduled training which is not includes in training calendar, Audit Training comes from audit that requirements of the non conformity to conduct training by gap found in audit. Auditor is finding the fact…

What is change control process? – control the changes
What is change control process? – control the changes What is change control process? Change process control is systematic approach, or key to controlling the changes to manage the impact to the product or system’ goals and objectives. There…

The 8 Phases of APQP – An Overview of Key Requirements
The 8 Phases of APQP – An Overview of Key Requirements 8 Phases of APQP Activity of APQP is carried out for any special customer requirements received, where entire manufacturing process cycle needs to be established. APQP is carried…

APQP
APQP stand for Advance Product Quality Planning Quality… Product………Planning…… “Planning to deliver Quality product for new product development” What is APQP? Advance Product Quality Planning is a structured & systematic method of defining and establishing the steps necessary to assure…