Safety Precaution for Work Permit
-
Checked availability of safe access to job site.
-
Checked availability of edge protection (hand rails, toe guard).
-
Checked availability of sufficient illumination at work spot.
-
Checked availability of safety belts & appliances.
-
Checked clearance taken from:
– Electrical / Mechanical Department.
– Instrument Department
– Civil for U.G. Cables & Pipelines
-
Checked Caution board mentioning ” Job in Progress” installed near working area
-
Checked availability of sufficient illumination at work spot.
-
Checked line is isolated by closing Valve & Caution Board for “Job-in Progress” is provided on Valve.
-
Checked electrical power to Pump/Valve/Compressor Isolated.
-
Checked Air /Oil from the lines are drained.
-
Checked availability of Water & fire extinguishers near the working spot.
-
Checked protection taken to safe guard Electrical cables if any near by.
-
Checked availability of sufficient illumination at work spot.
-
Check following before Start work:
– Isolator is switched off.
– Fuses are removed.
– Control supply is switched off.
–
-
Permit to Work copy provided on the panel.
-
Cable is disconnected at machine end / panel end ( as / if, applicable).
-
Movement of Machine / Part is arrested & display board for “Job in Progress” provided over machine.
-
Check Proper use of Personal Protective equipment.
-
Checked absence of hazardous substance.
-
Checked temperature at the work spot normalized.
-
Checked availability of sufficient illumination at work spot.
-
Checked availability of rescue arrangements.
-
Checked standby manpower deployed. (If necessary)
-
Checked flammable or combustible materials are removed from work site or covered with Fire – Blanket.
-
Checked hazardous substance is removed.
-
Check Fire extinguishers, Inert gas and water available at work site.