Continual Improvement report (Departmental)
Continual Improvement report (Departmental) As we discussed in previous article about continual improvement & continuous Improvement. Here we talk about the departmental continual improvement. Departmental Continual improvement recording is individual departments are improving in any activity, machine, machine’ part /…

Quality Assurance Plan (QAP)
Quality Assurance Plan (QAP) Quality Plan prepared by quality assurance department for the approval of customer to ensure the quality of the product will be high as quality assurance plan, customer inspect the quality assurance plan as requirement of its…

Preventive Action Request
Preventive Action Request Most of the industrial people are change or replace part after damage happen with machine or machine’s part, but the preventive actions are mostly not happens due to not awareness of the preventive action and ungrateful find…

First Part Approval (FPA) Request Note
First Part Approval (FPA) Request Note This request note are generates by purchase department to quality control / quality assurance department for first part approval. This request note need to ensure the quality of the product which is going to…

Overall equipment efficiency – OEE
Overall equipment efficiency (OEE) of Machine/ Equipment Machinery are runs in twenty four hours by seven that efficiency should be need to records, machines are run with full utilities or just organizations are bearing losses with machine that need…

Over head Crane Break down Cost Analysis
Over head Crane Break down Cost Analysis Analysis of the overhead crane is important as same as breakdown time analysis, costing of the breakdowns are reflect the financial & men hours. Find out each crane costing for the future budget…

Over head Crane Breakdown Analysis
Over head Crane Breakdown Analysis Cranes is critical equipment for plant that all the works can shutdown on break down of cranes. All the works are depended on cranes are very important works are assigned by operating of each…

Maintainability & Reliability Calculation Sheet
Maintainability & Reliability Calculation Sheet Controlling on “06 M” for the management is most important M is Machine, Productivity, Profits & company finance are depends on machinery that installed over plant, that is the reason management are focus on machine…

Audit Training Evaluation Sheet
Audit Training Evaluation Sheet Audit Training is unscheduled training which is not includes in training calendar, Audit Training comes from audit that requirements of the non conformity to conduct training by gap found in audit. Auditor is finding the fact…

Engineering charge review report
Engineering charge review report To consider basic functions of engineering requirements, engineering changes on drawing, developments are comes on regular basic, its all are natural requirements of engineering planning, most of inventions are success on trial & run basic that…