APQP Timing Chart
APQP [ Advance Product Quality Planning ] Timing Chart Advance product quality planning timing chart is monitoring evaluation of the project total time taken in activities, timing chart help to estimate duration of each activity and tracking each progress…

Process FMEA Checklist
Process FMEA Checklist Was the process FMEA prepared using the International motor vehicle manufacturer’s guidelines? Have all operations affecting fit,function,durability,governmental regulations and safety been identified and listed sequentially? Were similar part FMEA’s considered? Have historical campaign and…

Rework Analysis
Rework Analysis For the any organization, rework is duel loss in product line that also down the moral of people working in production line further its increasing wasting of time & money of organization, for reducing reworks of the production…

Production floor plan checklist points
PRODUCTION – FLOOR PLAN CHECKLIST POINTS General Points: Does the floor plan identify all required process and inspection points? Have clearly marked areas for all material, tools, and equipment at each operation been considered? Has sufficient space been allocated for…

PROCESS FLOW CHART CHECKLIST POINTS
PROCESS FLOW CHART CHECKLIST POINTS Does the flow chart illustrate the sequence of production and inspection stations? Were all appropriate FMEA’s (SFMEA, DFMEA) available and used as aids to develop the process flow chart? Is the flow chart keyed to…

Product/Process Quality Checklist points
PRODUCT/PROCESS QUALITY CHECKLIST POINTS General Questions: Is the assistance of the customer’s quality assurance or product engineering activity needed to develop or concur to the control plan? Has the supplier identified who will be the quality liaison with the customer?…

NEW EQUIPMENT, TOOLING, AND TEST EQUIPMENT CHECKLIST POINTS
NEW EQUIPMENT, TOOLING, AND TEST EQUIPMENT CHECKLIST POINTS Does the design require: New materials? Quick change? Volume fluctuations? Mistake proofing? Have lists been prepared identifying: New equipment? New tooling? New test equipment? Has acceptance criteria been agreed upon for: New…

Design Information Checklist Format
Design Information Checklist Format In advance product quality planning, when suppliers going for approval of product that before the product part approval, customer is asking for the design information that supplier are prepared design information checklist along with APQP form…

Design information Checklist Points : APQP
Design information Checklist Points : APQP A. General Does the design require: New materials? Special tooling? Has assembly build variation analysis been considered? Has Design of Experiments been considered? Is there a plan for prototypes in place? Has a DFMEA…

Audit Training Evaluation Sheet
Audit Training Evaluation Sheet Audit Training is unscheduled training which is not includes in training calendar, Audit Training comes from audit that requirements of the non conformity to conduct training by gap found in audit. Auditor is finding the fact…