Material life register
Material life register Material life register is very important part of the storage department, some peoples are confused with material life and material shelf life, so let’s see what is material shelf life first. Shelf life is a duration of…

Statistical Process Control Planning
Statistical Process Control Planning Statistical process Control (SPC) planning is unique technique for the maintain product’s variables to ensure the customer’s requirement that best quality product are going to deliver. Through statistical process controls that possible to control of product…

Frequency Distribution Diagram
Frequency Distribution Diagram Through statistically, a frequency distribution diagram is well structured more that two product parameter or variables taken for analysis to identify the variables’ boundaries, variations that is minimum & maximum level that support to identify the…

Performance Evaluation Form : Human Resource
Performance Evaluation Form : Human Resource Now days industries are saving money, increasing productivity through various technique like MFCA, 3R, six sigma, 5S etc., to concern the product and its manufacturing being lean through Lean manufacturing. Considering improvement in…

ISO 9001 – General Audit Checklist Points
ISO 9001 – General Audit Checklist Points CHECK LIST FOR AUDIT OF MR 1) CHECKING OF ALL ISO RELATED FILES AND RECORDS. 2) CHECKING OF LAST MANAGEMENT REVIEW MEETING POINTS. 3) DISCUSSION OF CUSTOMER RELATED PROBLEMS. 4) DISCUSSION OF CUSTOMER…

Special Characteristics Status Monitoring
Special Characteristics Status Monitoring In production line, some product that need to monitoring, controlling the variation of product in various sizes in case of manufacturer, monitoring on production line is very critical job as well as need to patient…

Production floor plan checklist points
PRODUCTION – FLOOR PLAN CHECKLIST POINTS General Points: Does the floor plan identify all required process and inspection points? Have clearly marked areas for all material, tools, and equipment at each operation been considered? Has sufficient space been allocated for…

PROCESS FLOW CHART CHECKLIST POINTS
PROCESS FLOW CHART CHECKLIST POINTS Does the flow chart illustrate the sequence of production and inspection stations? Were all appropriate FMEA’s (SFMEA, DFMEA) available and used as aids to develop the process flow chart? Is the flow chart keyed to…

Product/Process Quality Checklist points
PRODUCT/PROCESS QUALITY CHECKLIST POINTS General Questions: Is the assistance of the customer’s quality assurance or product engineering activity needed to develop or concur to the control plan? Has the supplier identified who will be the quality liaison with the customer?…

NEW EQUIPMENT, TOOLING, AND TEST EQUIPMENT CHECKLIST POINTS
NEW EQUIPMENT, TOOLING, AND TEST EQUIPMENT CHECKLIST POINTS Does the design require: New materials? Quick change? Volume fluctuations? Mistake proofing? Have lists been prepared identifying: New equipment? New tooling? New test equipment? Has acceptance criteria been agreed upon for: New…