Rejected request by Laboratory records
Rejected request by Laboratory records As per international standards ISO 17025 basic requirements is for recording of each rejected samples that are came for testing in laboratory, each records should…
Rejected request by Laboratory records As per international standards ISO 17025 basic requirements is for recording of each rejected samples that are came for testing in laboratory, each records should…
Customer Satisfaction Ratio When I was in class twelve, read the sentence that was “customer is king of market”, at the movement I was not well aware of the market…
Measuring Instrument / Equipment Calibration Compliance Report To ensure the measuring instrument and equipment are measuring correct, if the instruments are well calibrated, each measuring instruments and equipment should be…
Disposition of quality record In quality management system requirements, documents should be dispose as defined frequency of retention period till have to take care of the documents, hence the retention…
REQUISITION SLIP When the material required by any department, department prepared requisition slip with all the requirements send to store department, requisition slip send for the consumable goods requirements,…
Quality Assurance Plan (QAP) Quality Plan prepared by quality assurance department for the approval of customer to ensure the quality of the product will be high as quality assurance plan,…
Preventive Action Request Most of the industrial people are change or replace part after damage happen with machine or machine’s part, but the preventive actions are mostly not happens due…
First Part Approval (FPA) Request Note This request note are generates by purchase department to quality control / quality assurance department for first part approval. This request note need to…
Overall equipment efficiency (OEE) of Machine/ Equipment Machinery are runs in twenty four hours by seven that efficiency should be need to records, machines are run with full utilities…
Over head Crane Break down Cost Analysis Analysis of the overhead crane is important as same as breakdown time analysis, costing of the breakdowns are reflect the financial & men…